1.Create the Activity List Loaded with Cost and QTY.
2.Create WBS in 3 Different Methods in Excel and import to Primavera P6 .
3.Create activity Codes in Primavera P6.
4.Assign Activity Codes in Excel and import to primavera P6.
5.Import Activity List from Excel to P6.
6.Estimate activity duration.
7.Activity relationship & Sequence.
8.Make relationships and Check total Floats.
9.Import Cost from Excel To Primavera P6.
10.Make Shop DWG List in Excel and import to Primavera P6.
11.Make Material Submittal & Approval & Order list in Excel and import to Primavera P6.
12.Adjust and rectify total float for the program.
13.Estimate the Manpower for each activity in Excel .
14.Import Resource Loading from Excel to Primavera P6 .
15.QTY Loading in Excel and import to Primavera P6 .
16.Resource Leveling
17.Create Cash flow
18.Create Manpower Histogram
19.Create Shop DWG Tracking Log
20.Create Material Tracking Log
21.Submit Baseline Program Documents
22.Program update and Preparing The Weekly Report.